MAHARASHTRA
Seya Industries Ltd - Tarapur
Fabrication Erection of SS/MS Pipe Line & MS Structural & Equipment Installation.
Fabrication Erection of SS/MS Pipe Line & MS Structural & Equipment Installation.
Fabrication Erection of Sprinkler System utility System Fire Hydrant System above ground tank underground with wrapping & coating including of N2 system and Compressor unit system LPG System equipment unloading shifting erection alignment with all pipe line fabrication erection and leak testing including pipe racks fabrication, erection with painting.
Fabrication erection of MS, SS, HDPE pipe lines including MS Structure HDPE Storage Tanks and FRP Tanks, HP Heat Exchanger Tubes Expanding.
Fabrication Erection of HDPE, PVC & PP-pipe, PPFRP Pipe Lines including HDPE square tank and round tanks fabrication erections etc.
MS/ SS/ HDPE/ PPFRP pipe line MSPTFE pipe lines Fabrication Erection including MS Structural Boiler ducting, Boiler erection, equipment erection, Chimney erection and QC new Lab equipment and piping fabrication, erection including fire hydrant system, pipe lines fabrication, erection testing. Ammonia System Heat Exchanger Tubes Expanding And Welding.
MS Seamless pipe line fabrication erection leak testing for LPG system change over to CNG system including 6 Nos. LPG Bullet Tanks unloading shifting erection alignment through Mechalic Industries Ltd. Work at Tata Telco (Pune)
Dismantling of Spinning machines and re-erection of new Spinning machines including lead ducting round square pipes rubber lining pipe, erection alignment etc and 700 KL MS storage tanks fabrication erection at site including Sulpher Plants ducting 1.5m dia, 1 mtr. Dia and other small dia pipe structure fabrication/erection/shut down job and new projects 100% job completion before time.
Fabrication Erection of SS,MS, GI Pipe Line MSPTFE Pipe line, HDPE Pipe line and MS-structure fabrication erection alignment including Boiler erection and Boiler Chimney erection alignment, equipment unloading shifting erection of MS, SS, MSGI, HDPE and PPFRP Tanks.
Supply and Fabrication, erection of 6 Nos. 50 KL MS Storage Tank including hand railing fabrication, erection & Civil work also.
MS, SS, HDPE, PPFRP pipe line MSPTFE pipe lines Fabrication Erection including MS Structural Boiler ducting, Boiler erection, equipment erection, Chimney erection and distillation column with reboiler erection packing with all vacuum pumps totally system erection alignment and commissioning etc.
Fabrication Erection of MS, SS Pipe Line and MS Structure including 40 Nos. HU and (Chiller) erection alignment commissioning etc. Bombay Examination Centre at Goregaon (East).
(Civil Work & Mechanical work) Earth excavation 40 Nos. footings for RCC Column including PCC flooring and brick walls including mechanical job MS, SS, HDPE, PPFRP pipe line MSPTFE pipe lines Fabrication Erection including MS Structural Boiler ducting, Boiler erection, equipment erection, Chimney erection and fixing of AC Sheet & sliding Sheet including Sand Blasting. & Painting Job also.
Fabrication Erection of MS structural for Cozen Plant including all equipment erection and fire hydrant system pipe line fabrication, erection including erection of equipment and fabrication erection of MS/SS pipeline HDPE/ PPFRP pipelines also and 1 Nos. MS storage Tank fabrication, erection including Shutdown job also.
Fabrication Erection of Sprinkler System utility System ,Fire Hydrant System above ground tank underground with wrapping & coating including of N2 system and Compressor unit system LPG System equipment unloading shifting erection alignment with all pipe line fabrication erection and leak testing including pipe racks fabrication, erection with painting.
Fabrication Erection of Sprinkler System utility System Fire Hydrant System above ground tank underground with wrapping & coating including of N2 system and Compressor unit system LPG System equipment unloading shifting erection alignment with all pipe line fabrication erection and leak testing including pipe racks fabrication, erection with painting.
Supply & Fabrication Erection of MS structure for tower diameter 6.5 Mtr. and height 45 Mtr. Including MS/SS pipe line fabrication erection testing and other small structures fabrication, erection including erection alignment of MS/SS equipment.
MS/ SS/ HDPE/ PPFRP pipe line MSPTFE pipe lines Fabrication Erection including MS Structural Boiler ducting, Boiler erection, equipment erection, Chimney erection and QC new Lab equipment and piping fabrication, erection including fire hydrant system, pipe lines fabrication, erection testing.
Fabrication, Testing, Erection & Commissioning of DM Water Carbon Steel tank.
Fabrication, Erection of utility pipelines and process pipelines fire hydrant systems MS-Structural fabrication and erection including MS, SS, MSGL equipment erection including boiler ducting and chimney fabrication erection including Boiler Tubes Removing Refitting and Expanding.
MS / SS / HDPE / PPFRP pipeline MSPTFE pipe lines Fabrication, Erection, including MS Structural Boiler ducting, Boiler erection, equipment erection, Boiler, Chimney erection and QC new lab equipment and piping fabrication, erection including fire hydrant system, pipeline fabrication, erection, testing including fixing of AC sheet & Meta Color Power coated Sheet.
MS, SS, HDPE, PPFRP pipe line MSPTFE pipe lines Fabrication Erection including MS Structural Boiler ducting, Boiler erection, equipment erection, Boiler, Chimney erection.
Fabrication Erection of MS/ SS/ HDPE Pipe Line including Hastalloy pipelines MS structure fabrication erection alignment including Boiler erection, Boiler, Chimney erection and MS/ SS/ MSGL equipment erection alignment etc.
Fabrication Erection of SS/MS Pipe Line & MS Structural & Equipment erection of Pharmaceutical including MS/SS Storage Tank fabrication & Erection.
Fabrication, Erection, Dismantling, Shifting of SS/MS Pipe Line & MS Steel Structural & Equipment.
2 Meter dia PPFRP round ducting Fabrication Erection and old ducting dismantling and new ducting erection alignment up to zero meter level to 45 Meter Level including all pipe supports fabrication erection and commissioning through K K Nag India Ltd., Pune work at Zuari Agro Fertilizers Goa MAPSA.
Fabrication Erection of MS, SS Pipe Line above ground & underground wrapping & coating including Intake Pump house, Raw Water Pump House Chemical House, all electrical motors horizontal motors erection alignment commissioning with pipe lines and erection of Monorail Cranes with Painting Job, Electrical job & instrument job also.
Erection of CMDI & DI, Cast Iron pipe line including MS/ SS/ GI & earth excavation work also.
(Civil Job and Mechanical job for Cross Country Pipe Line and Network Pipeline) Earth Excavation for lining of CMDI Pipe lines 900 mm dia to 150 mm dia and MS pipeline fabrication erection alignment above ground and underground with wrapping & coating including Intake Pump house, Raw Water Pump House Chemical House, all electrical motors horizontal motors erection alignment commissioning with pipe lines and erection of Monorail Cranes with Painting Job, Electrical Job and Instrument job RCC Overhead Tank CMDI pipelines & MS Pipelines inlet and outlet fabrication erection testing & civil work all the Block valve chamber drainage manhole and pedestal RCC Column etc.